Exhaust and Intake Placement in Lean-To Greenhouses
Route exhaust and intake paths longitudinally along the host wall or diagonally from a low front kneewall to a high opposite end wall, while discharging exhaust away from host-building eaves, soffits, and operable windows and sealing all wall-flashing and ledger-joint gaps. For general symmetric airflow principles across freestanding structures, see the parent Airflow Path Placement reference.
← Exhaust & Intake Placement to Prevent Air Short-Circuiting
In an attached lean-to greenhouse up to 485 ft² (45 m²), the asymmetric single-slope roof and shared host wall trap hot air along the upper ridge while starving the low front eave of air exchange. Placing the exhaust fan high on an end wall and the intake low on the opposite end wall—or low along the front kneewall—forces fresh air across the crop canopy before exiting, rather than short-circuiting along the host wall.
Boundary Conditions That Change Placement
- Host-building overhang and soffit vents: If the house roof projects over the greenhouse ledger or has vented soffits directly above the lean-to, do not exhaust upward or toward the host wall. Warm, humid greenhouse exhaust drawn into vented soffits condenses inside the host roof framing.
- Operable house windows or doors: Exhaust fans must discharge at least 10 ft (3.0 m) horizontally from—or downwind of—any operable host-building window, door, or fresh-air intake to prevent humid air and crop odors from entering the living space.
- Prevailing summer wind direction: Orient the exhaust fan on the leeward end wall whenever site layout permits. Exhausting into a prevailing headwind adds static pressure and cuts fan airflow below the Q-H curve operating point.
- Lean-to aspect ratio (length vs. projection): Long, narrow lean-tos (length greater than 2x projection from the host wall) require longitudinal end-to-end flow or multiple distributed front-kneewall intakes to avoid stagnant corners at the far end.
- Winter heating vs. summer cooling: Low front intakes and high end-wall exhaust fans require tight-sealing backdraft dampers and perimeter weatherstripping so winter wind pressure does not drive cold infiltration through the exhaust housing or unsealed ledger flashing.
Lean-To Airflow Geometry and Placement Options
| Configuration | Intake Position | Exhaust Position | Best Use Case | Primary Risk |
|---|---|---|---|---|
| Longitudinal End-to-End | Low on windward end wall, centered below bench height | High on opposite leeward end wall, near ledger peak | Narrow lean-tos with length >= 2x projection | Front-eave dead zone if intake sits too close to host wall |
| Low Front Kneewall to High End Wall | Distributed along front kneewall below bench level | High on one end wall, offset toward the upper ridge | Wide lean-tos or sites where one end wall is blocked | Uneven draw if intakes are not throttled closer to the fan |
| End-Wall to Roof-Slope | Low on opposite end wall | High on gable end, never through host-wall soffit | Short square lean-tos under 12 ft (3.7 m) long | Short-circuiting if exhaust and intake share the same side |
Intake Sizing and Static-Pressure Specifications
Size the intake opening from the target summer exhaust airflow (typically 1 air change per minute, or 60 ACH, in hobby greenhouses; verify exact crop cooling load) divided by the allowable face velocity, then divide by the combined louver and insect-screen free-area ratio to find the gross frame opening:
Net Intake Area (ft²) = Target Airflow (CFM) / Allowable Face Velocity (FPM)
Net Intake Area (m²) = Target Airflow (m³/s) / Allowable Face Velocity (m/s)
Gross Frame Area = Net Intake Area / Combined Free-Area Ratio
Keep intake face velocity at 300–500 FPM (1.52–2.54 m/s) to limit static-pressure drop and prevent high-speed drafts from desiccating seedlings near the kneewall. Verify the exact free-area ratio of the chosen louver and insect screen on the manufacturer datasheet, and confirm the fan can deliver the target CFM (m³/h) against the combined intake, screen, and exhaust-shutter static pressure on its published Q-H curve—never rely on zero-static-pressure (free-air) ratings.
Illustrative Sizing Example
Illustrative assumptions: A 16 ft × 10 ft (4.88 m × 3.05 m) lean-to greenhouse with a 6 ft (1.83 m) front kneewall and a 10 ft (3.05 m) rear ledger has an average height of 8 ft (2.44 m) and an internal volume of 1,280 ft³ (36.25 m³).
- Target exhaust airflow (60 ACH): 1,280 CFM (2,175 m³/h, or 0.604 m³/s).
- Net intake area at 400 FPM (2.03 m/s) face velocity:
- 1,280 CFM / 400 FPM = 3.20 ft², or 461 in² (0.298 m²).
- Gross frame area with a 0.55 (55%) combined louver-and-screen free-area ratio:
- 3.20 ft² / 0.55 = 5.82 ft², or 838 in² (0.541 m²).
- Two low front kneewall intakes measuring 24 in × 18 in (610 mm × 457 mm) each provide 864 in² (0.557 m²) gross area, satisfying the target with margin.
Winter Ledger-Joint Leakage and Infiltration Heat Loss
In a lean-to greenhouse, the horizontal ledger board where the greenhouse roof meets the host wall—and the vertical end-wall junctions against siding or masonry—are the primary winter air-leakage paths. Unsealed corrugated or multi-wall polycarbonate flutes, gaps behind metal counterflashing, and unsealed exhaust shutters raise winter air changes per hour (ACH) and increase sensible heating demand:
Infiltration Heat Loss (BTU/h) = 0.018 BTU/(hr·ft³·°F) × Volume (ft³) × ACH × delta-T (°F)
Infiltration Heat Loss (W) = 0.335 W/(m³·K) × Volume (m³) × ACH × delta-T (K)
Using the illustrative 1,280 ft³ (36.25 m³) lean-to at a 40°F (22.2°C / 22.2 K) indoor-to-outdoor temperature difference:
| Envelope Condition | Assumed Winter ACH | Infiltration Heat Loss |
|---|---|---|
| Tightly sealed ledger, flutes, and gasketed dampers | 1.0 ACH | 922 BTU/h (270 W) |
| Unsealed ledger flashing and loose shutters | 2.5 ACH | 2,304 BTU/h (674 W) |
| Extra continuous heat loss from leakage | +1.5 ACH | 1,382 BTU/h (404 W) |
If an electric space heater is used to offset this leakage on a standard 120 V / 15 A continuous circuit budget (1,440 W maximum total continuous load), 404 W of avoidable infiltration consumes 28% of the entire circuit capacity.
Step-by-Step Placement and Sealing Procedure
- Map host-building clearances: Measure horizontal and vertical distances from the proposed exhaust wall to all host soffit vents, windows, doors, and HVAC fresh-air intakes. Position the exhaust fan on the end wall facing away from the house and outside the 10 ft (3.0 m) clearance zone.
- Locate the exhaust fan high: Mount the exhaust fan on the upper third of the chosen end wall, centered toward the high ledger side rather than the low front kneewall, with a motorized or weighted backdraft shutter on the exterior face.
- Locate the intake low and opposite: Mount the intake louver on the opposite end wall—or distribute multiple smaller intakes along the front kneewall—at or below bench height so incoming air sweeps under and through the crop canopy.
- Seal the ledger and end-wall joints: Install closed-cell foam closure strips matching the glazing profile along the ledger transition, apply exterior-grade UV-stable sealant behind the host-wall flashing, and caulk vertical end-wall trim against the host siding.
- Fit winter damper seals and insulated covers: Verify that intake and exhaust shutters close flush against perimeter weatherstripping when the fan is off. For cold-climate overwintering, add removable insulated magnetic or rigid-foam covers over the interior fan housing when mechanical exhaust is disabled.
Verification Checks
- Smoke or tissue trace test: With the exhaust fan running at full speed and the greenhouse door latched, hold a light ribbon or smoke pencil at the front kneewall corners and under benches. Air should move steadily toward the exhaust wall without stalling in front-eave pockets.
- Soffit recirculation check: Stand outside on the leeward side while the fan runs; confirm the exhaust plume clears the house roof overhang rather than curling up into vented soffits or open windows.
- Static-pressure and amperage check: Confirm the fan motor current draw matches the nameplate rating under loaded operating conditions (with shutters open and insect screens installed), ensuring the added screen restriction has not pushed the fan into stall or overload.
- Winter draft check: On a windy night with the exhaust fan off, inspect the ledger joint, end-wall trim, and shutter blades by hand or with an anemometer to confirm zero measurable cold-air bypass.
Real Failure Modes
- Soffit condensation and mold in the host roof: Mounting an exhaust fan high on the end wall directly beneath a vented house eave drives 70–90% RH greenhouse air into the host attic cavity, causing hidden framing rot during cool nights.
- Front-eave heat stagnation: Placing both intake and exhaust along the taller rear half of the lean-to leaves the low front kneewall bench stagnant, raising leaf temperatures and triggering localized wilting or fungal pressure.
- High-velocity bench desiccation: Undersizing the gross intake area (or ignoring a 40–50% insect-screen free-area penalty) drives intake face velocities above 600 FPM (3.05 m/s), scorching foliage directly in front of the louver.
- Chronic winter heat loss through ledger flutes: Leaving open multi-wall polycarbonate flutes or uncaulked flashing along the host wall creates a continuous stack-effect chimney that defeats thermostat control and overloads 120 V / 15 A heating circuits.