Converting Concentrate Requirements Into Controlled Dosing Duration

Divide the established concentrate requirement in mL by the calibrated metering pump delivery rate in mL/min and multiply by 60 to set the pump run duration in seconds:

Run Duration (s) = (Concentrate Requirement (mL) / Calibrated Delivery Rate (mL/min)) x 60

This direct linear conversion holds only within the pump's repeatable operating window. Two boundary conditions change how the calculated duration is executed:

  1. Sub-minimum pulse duration: When the calculated run time falls below the pump's minimum repeatable pulse duration (typically 1–3 s on hobby peristaltic and diaphragm metering pumps, depending on motor ramp-up, check-valve seating, and tubing elasticity—verify the exact threshold on the pump datasheet or via catch testing), stepper/DC start-stop transients cause large volume errors. Step down to a diluted working stock so the required volume produces a longer, repeatable pulse.
  2. Large single-shot additions and multi-part chemistry: When a single continuous dose exceeds safe local mixing capacity or involves multi-part concentrates (Part A and Part B) or pH adjusters, split the total duration into smaller spaced pulses separated by a full reservoir turnover interval. Never dose Part A and Part B simultaneously or through the same manifold without flushing/mixing in between.

For system-level architecture, sensor feedback loops, and interlocks, see the dosing automation overview.


Dosing Duration Operating Regimes

The table below defines how to handle a calculated run duration based on the pump's minimum repeatable pulse time (t_min) and the reservoir's mixing capacity.

Operating Regime Condition Execution Rule Primary Risk Prevented
Sub-minimum pulse Run Duration < t_min (typically < 1–3 s) Dilute concentrate into a working stock (1:2 to 1:10 with RO/distilled water) to scale duration above t_min Motor startup lag, check-valve chatter, and severe under- or over-dosing
Standard single pulse t_min <= Run Duration <= Split Limit Run as one continuous timed pulse into a high-turbulence mixing zone Unnecessary relay/motor cycling
Split-dose sequence Run Duration > Split Limit or high-strength pH/EC correction Divide total seconds into N equal pulses separated by a complete reservoir turnover interval Local pH shock, nutrient salt precipitation, and EC25 sensor overshoot
Two-part separation Part A + Part B both required Complete Part A duration + full reservoir mixing wait before starting Part B duration Insoluble calcium-phosphate or calcium-sulfate precipitation

Note: Verify t_min on the pump datasheet or by running three consecutive test pulses at 1 s, 2 s, and 3 s into a graduated cylinder. Set the Split Limit based on reservoir turnover time and target EC25/pH step size rather than a fixed universal second count.


Key Specifications and Calibration Inputs

Accurate time-based dosing requires measuring real-world delivery under installed conditions rather than relying on nameplate ratings.

Parameter Unit Source / Verification Method Effect on Duration Calculation
Operating reservoir volume gal (L) Measured at normal pump-on operating level (excluding pump-off drain-back volume) Sets the true Concentrate Requirement (mL) before duration is calculated
Calibrated delivery rate mL/min Timed gravimetric or graduated-cylinder catch test at actual lift height and injection backpressure Denominator of the duration formula; differs from zero-head datasheet ratings
Minimum repeatable pulse (t_min) s Pump datasheet or repeated short-pulse catch test Lower bound before working-stock dilution is required
Tube / line dead volume mL Internal cross-sectional area x tube length from check valve to injection point Must remain primed; air gaps subtract directly from delivered volume
Reservoir turnover interval s or min Operating volume / circulation pump flow at actual head Sets minimum wait time between split pulses and between Part A and Part B

Step-by-Step Conversion Procedure

1. Calibrate Delivery Rate Under Installed Conditions

Measure the pump's actual output with the exact tubing ID, suction lift, discharge elevation, and anti-siphon/check valve installed:

  1. Prime the suction and discharge lines completely so no air bubbles remain.
  2. Run the pump for a fixed calibration window (e.g., 60 s) into a graduated cylinder or tared scale (1.00 g ≈ 1.00 mL for water).
  3. Repeat three times and average the result to establish Calibrated Delivery Rate (mL/min).

2. Compute Raw Run Duration

Convert the required concentrate volume (V_req, in mL) into seconds using the calibrated rate (Q_cal, in mL/min):

Flow Rate (mL/s) = Q_cal / 60 Run Duration (s) = V_req / Flow Rate (mL/s)

Illustrative Example (Standard Regime):

  • Operating reservoir: 50 gal (189.3 L)
  • Established Part A requirement: 45.0 mL
  • Calibrated pump rate: 60.0 mL/min (1.00 mL/s)
  • Calculation: (45.0 mL / 60.0 mL/min) x 60 = 45.0 s

3. Check Against Minimum Repeatable Pulse (t_min)

Compare Run Duration (s) to the pump's verified t_min. If Run Duration < t_min, calculate the required dilution factor (DF):

Minimum Dilution Factor = t_min / Run Duration (s)

Round up to a clean integer ratio (e.g., 1:4, 1:5, or 1:10) using reverse-osmosis or distilled water to prepare a working stock, then multiply V_req by DF before recalculating Run Duration (s).

Illustrative Example (Sub-Minimum Dilution Step-Down):

  • Operating reservoir: 10 gal (37.9 L)
  • Established pH adjuster requirement: 2.0 mL
  • Calibrated pump rate: 60.0 mL/min (1.00 mL/s), with verified t_min = 3.0 s
  • Raw duration: (2.0 mL / 60.0 mL/min) x 60 = 2.0 s (below 3.0 s threshold)
  • Step down to a 1:4 working stock (1 part concentrate + 3 parts RO/distilled water; DF = 4):
    • Working-stock volume required: 2.0 mL x 4 = 8.0 mL
    • Adjusted duration: (8.0 mL / 60.0 mL/min) x 60 = 8.0 s (safely above 3.0 s)

4. Split Large Additions and Separate Part A/B

When a single pulse would create a localized EC25 or pH spike, or when dosing both Part A and Part B:

  1. Divide the total Run Duration (s) into N equal sub-pulses (for example, 180 s split into 3 x 60 s or 4 x 45 s).
  2. Space each sub-pulse by at least one full reservoir turnover interval so the circulation pump homogenizes the solution before the next pulse or before an inline EC25/pH probe reads the change.
  3. Complete all Part A sub-pulses and allow full mixing before initiating any Part B pulse.

Verification Checks

Run these checks after programming a new dosing duration or changing tubing/concentrates:

  • Volumetric pulse check: Trigger one programmed cycle into a graduated cylinder instead of the reservoir and confirm delivered volume matches V_req within ±5%.
  • Line-priming check: Inspect the discharge line between the pump head and the reservoir injection point before and after the pulse; fluid must stay pinned at the tip without draining back into the stock bottle.
  • Post-mix EC25 and pH stabilization check: After the final split pulse and one full turnover interval, measure solution EC25 (mS/cm) and pH (target 5.5–6.5) with a temperature-compensated meter at safe solution temperature (65–72°F / 18–22°C) to confirm the calculated mass addition produced the expected chemical shift.

Real Failure Modes

  • Sub-minimum pulse nonlinearity: Running a pump for 0.5–1.5 s when motor inertia and check-valve cracking pressure consume most of the cycle yields inconsistent or zero output. Always step down to diluted working stock when duration approaches t_min.
  • Nameplate flow rate assumption: Using a datasheet zero-head rating (e.g., 100 mL/min) when suction lift, viscous concentrates, or a spring-loaded check valve reduce actual flow to 72 mL/min systematically under-doses every cycle by 28%.
  • Peristaltic tubing compression set and wear: Squeeze-tube elasticity degrades over operating hours, dropping mL/min delivery even at constant motor RPM. Re-calibrate delivery rate on a fixed maintenance schedule and after every tubing replacement.
  • Unprimed dead volume and siphon drain-back: Missing or fouled check valves allow concentrate to drain back down the tube between cycles; subsequent short pulses spend their run seconds refilling air space instead of dosing the reservoir.
  • Insufficient mixing delay between pulses: Triggering consecutive pulses or Part A/B additions faster than the reservoir turnover time causes concentrated plumes to hit roots or trigger false high/low readings on EC25 and pH controllers, leading to oscillation and precipitation.