Calibrated Part A and Part B Dosing for Recirculating Systems
Calibrated dosing in recirculating systems must use the actual operating liquid volume in US gal (L)—excluding the empty drain-back reserve—and top-up calculations must restore evaporated water to the operating mark before measuring current EC25 (mS/cm).
Reservoir volume, Part A/B dosing & EC25 drift calculator
Separate operating liquid volume from pump-off drain-back, calculate calibrated Part A/B concentrate milliliters, and triage temperature-referenced EC25 trends.
Use the nutrient dosing calculator to compute exact Part A and Part B mL additions for both full recirculating fills and post-top-up replenishment. For general two-part concentrate chemistry and non-recirculating baselines, see calibrated concentrate dosing.
Boundary Conditions That Change the Calculation
- Operating liquid volume (
V_op) vs. nominal tank capacity: In recirculating systems (NFT channels, ebb-and-flow trays, and Dutch bucket loops), the reservoir must hold an empty upper headspace while the pump is running so in-transit water can drain back safely during a power outage or pump-off cycle. Dosing against nominal tank capacity over-concentrates the active solution; dosing against only the pump-on sump depth while ignoring water circulating in pipes and channels under-concentrates it. - Full fill vs. post-top-up replenishment: A full fill starts from source-water baseline
EC25and doses the full concentrate rate forV_op. A top-up replenishment must first restore water lost to evapotranspiration back to the pump-on operating fill line, mix, and only then dose the proportionalEC25deficit. - Source-water baseline
EC25: Subtract baseline source-waterEC25from both the target and currentEC25readings before computing replenishment fractions so background minerals are not treated as dosed fertilizer. - Temperature and ATC meter discipline: Keep solution temperature at
65–72°F (18–22°C); temperatures>=75°F (24°C)lower the dissolved oxygen ceiling and raisePythiumroot-rot risk. Use an automatic temperature compensation (ATC) meter reportingEC25 (mS/cm)directly, and never manually re-compensate an ATC reading. - Meter scale consistency: If a meter displays ppm instead of
mS/cm,500(NaCl) and700(442) are display conversion factors applied to the sameEC25measurement—never a 40% difference in actual dissolved salt.
Volume Accounting and Dosing Equations
Measure V_op once per system build (or after any plumbing or media change) by filling to the settled pump-off level below the safety freeboard, or by summing the pump-on sump volume and the active in-transit loop volume:
V_op (L) = V_op (US gal) * 3.7854
V_op = V_settled_pump_off = V_sump_pump_on + V_in_transit
For a full recirculating fill, calculate each concentrate separately from the manufacturer's target rate (verify the exact mL/US gal or mL/L rate for your crop stage on the concentrate datasheet):
Dose_part (mL) = V_op (US gal) * Rate_part (mL/US gal)
Dose_part (mL) = V_op (L) * Rate_part (mL/L)
For post-top-up replenishment, restore water to the pump-on fill line first, circulate until uniform, and calculate the remaining net EC25 fraction:
EC_net_target = EC_target - EC_source
EC_net_current = EC_current - EC_source
Fraction_needed = (EC_net_target - EC_net_current) / EC_net_target
Topup_dose_part (mL) = Full_fill_dose_part (mL) * Fraction_needed
Apply Fraction_needed only when EC_current < EC_target and EC_net_target > 0. Run these inputs directly through the nutrient dosing calculator to avoid unit-conversion errors between US gal, L, and mL.
Specifications and Illustrative Dosing Reference
Recirculating Reservoir Volume Zones
| Reservoir Zone | Pump-On State | Pump-Off State | Include in V_op? |
Engineering Role |
|---|---|---|---|---|
| Pump-on sump volume | Submerged in tank | Submerged in tank | Yes | Maintains pump NPSH/submergence and thermal mass |
| In-transit loop volume | Wetting pipes, channels, emitters, and media film | Drains back into reservoir | Yes | Active nutrient solution feeding root zones |
| Drain-back reserve (headspace) | Empty air above operating fill line | Filled by returning loop water | No | Prevents reservoir overflow on pump shutoff |
| Safety freeboard | Empty air at tank rim | Empty air above settled water | No | Splash and sensor-clearance margin |
Illustrative Recirculating Dosing Examples (Full Fill vs. Top-Up)
Illustrative assumptions: A recirculating Dutch bucket or NFT system uses a 40.0 US gal (151.4 L) nominal tank with 10.0 US gal (37.9 L) reserved for drain-back and freeboard, giving V_op = 30.0 US gal (113.6 L). Source water baseline is EC_source = 0.20 mS/cm. Target solution is EC_target = 1.80 mS/cm (EC_net_target = 1.60 mS/cm) at 68°F (20°C) and pH 5.5–6.5, using an illustrative concentrate rate of 8.0 mL/US gal (2.11 mL/L) for both Part A and Part B. Verify actual concentrate rates on your product datasheet.
| Scenario | Water State Before Dosing | Measured EC25 (mS/cm) |
Net EC25 Deficit (mS/cm) |
Part A Dose | Part B Dose |
|---|---|---|---|---|---|
| Full recirculating fill | Filled to 30.0 US gal (113.6 L) with source water |
0.20 (baseline) |
1.60 (100%) |
240 mL |
240 mL |
| Evaporated tank (incorrect pre-top-up check) | Dropped 4.0 US gal (15.1 L) to 26.0 US gal (98.4 L) |
1.75 (artificially concentrated) |
Do not dose yet | 0 mL (restore water first) |
0 mL (restore water first) |
| Post-top-up replenishment | Restored 4.0 US gal (15.1 L) back to 30.0 US gal (113.6 L) and mixed |
1.48 |
0.32 (20% of full fill) |
48 mL |
48 mL |
Step-by-Step Procedure
1. Calibrate and Mark Operating Volume (V_op)
- With the pump off, fill the reservoir using a flow meter or measured containers until the water reaches the maximum safe settled level, leaving enough freeboard for splash and sensor clearance.
- Start the circulation pump and let channels, manifolds, stone wool blocks, or expanded clay pebbles wet and stabilize for 10–15 minutes.
- Mark the pump-on operating fill line on the inside and outside of the reservoir wall. Verify that the pump intake remains well submerged at this level.
- Turn the pump off and confirm all returning drain-back water settles at the initial measured
V_opmark without overflowing. RecordV_opin US gal (L).
2. Full Recirculating Fill Dosing
- Fill the system to
V_op, circulate until mixed, and confirm solution temperature is65–72°F (18–22°C). Measure and recordEC_source. - Enter
V_op,EC_source, andEC_targetinto the nutrient dosing calculator to obtain Part A and Part B mL volumes. - Measure Part A in a clean graduated cylinder and pour it into the turbulent return stream of the reservoir. Circulate for 5–10 minutes until fully dispersed.
- Rinse the measuring cylinder with clean water (or use a dedicated second cylinder), measure Part B, and pour it separately into the circulating reservoir. Never combine undiluted Part A and Part B in the same vessel.
- Circulate for 10–15 minutes, verify final
EC25, and adjust pH to5.5–6.5only after both concentrates are fully dissolved.
3. Post-Top-Up Replenishment Dosing
- Do not sample
EC25on a low reservoir. Add plain source water (or RO water) until the liquid level returns to the pump-on operating fill line. - Run the circulation pump for 10–15 minutes so fresh top-up water blends evenly with the in-transit loop.
- Measure stabilized
EC25and temperature (65–72°F / 18–22°C) with an ATC-enabled meter. - Calculate the replenishment mL for Part A and Part B using the nutrient dosing calculator with
V_op,EC_source,EC_current, andEC_target. - Dose Part A, circulate 5–10 minutes, dose Part B separately, circulate 10–15 minutes, and verify
EC25andpH (5.5–6.5).
Verification Checks
- Drain-back safety check: Briefly cut pump power after calibration and verify the returning loop water stops below the tank rim with margin to spare.
- Post-mix
EC25check: Confirm measuredEC25matches the target within meter tolerance (±0.05 to ±0.10 mS/cm). - Precipitation check: Inspect the reservoir floor and pump strainer for cloudy white haze or grit; clear solution confirms Part A and Part B stayed soluble.
- pH stabilization check: Re-test
pH (5.5–6.5)30 minutes after the final concentrate addition, as concentrated nutrients shift solution buffering.
Real Failure Modes
- Dosing to nominal tank capacity: Including empty drain-back headspace in the dose calculation overdoses the solution proportionally (for example, dosing
40 US galinto a30 US galV_opcreates a+33%salt overdose), causing osmotic stress and leaf-margin burn. - Measuring
EC25before topping up evaporated water: Water leaves the system faster than dissolved ions, making the reduced volume read artificially high. Dosing—or withholding feed—from pre-top-upEC25miscalculates total nutrient inventory. - Combining Part A and Part B before dilution: Mixing concentrated calcium (Part A) with concentrated sulfates or phosphates (Part B) forms insoluble calcium sulfate or calcium phosphate precipitate, permanently stripping nutrients from solution and fouling pumps and emitters.
- Warm reservoir dosing (
>=75°F / 24°C) or manual ATC re-compensation: Warm solution lowers the dissolved oxygen ceiling and raisesPythiumroot-rot risk, while manually re-adjusting an ATC meter'sEC25reading introduces false concentration errors. - Mixing up
500and700ppm scales: Treating a700-scale ppm readout as 40% more dissolved fertilizer than a500-scale readout leads to severe under-dosing when switching meters; always calibrate and dose fromEC25 (mS/cm).