Part A and Part B Mixing Sequence for RO Water
In unbuffered reverse osmosis (RO) water, dilute potassium silicate first in neutral water, homogenize any calcium-magnesium remineralizer before Part A and Part B, and apply final pH trims in pre-diluted micro-steps. Unlike tap or well water containing carbonate alkalinity, RO water has near-zero buffering capacity (< 0.1 mS/cm EC25 and minimal bicarbonate), which causes sharp pH spikes when alkaline additives enter and rapid pH crashes when acid is added.
For the general two-part mixing sequence in buffered source water, see Part A and Part B Mixing Sequence.
Boundary Conditions That Change the Sequence
- Potassium silicate inclusion: If potassium silicate is omitted, start directly with the calcium-magnesium remineralizer or Part A. When potassium silicate is used, it must enter neutral RO water first and be fully dispersed; if it raises solution pH above
7.5–8.0, bring pH back toward6.0–6.8with pre-diluted acid before adding calcium-magnesium or Part A to prevent localized calcium-silicate or micronutrient precipitation. - Calcium-magnesium (Ca-Mg) remineralization: Pure RO water lacks background calcium (
Ca) and magnesium (Mg). Any separate Ca-Mg supplement must be diluted and circulated into the reservoir before Part B so concentratedCaions never contact concentrated sulfates (SO4) or phosphates (PO4) in Part B. - Zero-alkalinity pH sensitivity: Because RO water lacks carbonate hardness (
KH), adding full-strength pH down or pH up causes extreme localized pH swings and overshoot. Pre-dilute pH adjusters in a separate container of RO water at1:10to1:20by volume before dosing in small increments. - Solution temperature limits: Mix and operate within
65–72°F (18–22°C). Mixing in water at>= 75°F (24°C)lowers the dissolved oxygen ceiling, increases Pythium root-rot risk, and accelerates chemical reaction rates that promote precipitation.
RO Mixing Specifications and Targets
| Parameter | Target / Operating Range | Engineering Note |
|---|---|---|
| Starting RO EC25 | 0.00–0.05 mS/cm |
Verify membrane rejection; higher readings indicate exhausted RO filters or bypass leakage. |
| Solution Temperature | 65–72°F (18–22°C) |
Keep below 75°F (24°C) to preserve dissolved oxygen and limit Pythium pressure. |
| Primary Concentration Metric | Temperature-referenced EC25 (mS/cm) |
Read directly from an Automatic Temperature Compensation (ATC) meter; never manually re-compensate ATC readings. |
Meter Scale Note (500 vs 700) |
500 (NaCl) or 700 (442) ppm scale |
Reflects meter conversion factor only (ppm = EC25 x factor), never a 40% difference in actual dissolved salt mass. |
| Operating pH Range | 5.5–6.5 |
Maintain after full homogenization; unbuffered RO water drifts rapidly if adjusted before salts stabilize. |
| Homogenization Interval | 5–15 min active circulation per step |
Confirm uniform mixing via circulation pump or aeration before adding the next component. |
Additive Order for Unbuffered RO Water
Never mix concentrates together in a measuring cup or dosing vessel. Add each component directly into the full operating reservoir volume under active circulation.
| Step | Additive | Placement & Condition | Mixing Action |
|---|---|---|---|
| 1 | Base RO Water | Fill reservoir to operating volume at 65–72°F (18–22°C) |
Start circulation pump or air stones; verify baseline EC25 <= 0.05 mS/cm. |
| 2 | Potassium Silicate (optional) | Add first into neutral RO water | Stir and circulate 10–15 min until fully clear. |
| 3 | Intermediate pH Trim (conditional) | Only if Step 2 pushes pH > 7.5 |
Add pre-diluted acid in micro-steps to bring pH to 6.0–6.8; circulate 5–10 min. |
| 4 | Ca-Mg Remineralizer (optional) | Add after silicate is stabilized, before Part A and Part B | Circulate 5–10 min; confirm target base EC25 contribution. |
| 5 | Part A Concentrate | Contains calcium nitrate and chelated iron; keep separate from Part B | Measure per datasheet, dilute into reservoir, circulate 5–10 min. |
| 6 | Part B Concentrate | Contains sulfates and phosphates | Measure per datasheet, dilute into reservoir, circulate 10–15 min. |
| 7 | Final pH Trim | Adjust only after full EC25 stabilization | Dose 1:10 to 1:20 pre-diluted pH adjuster in micro-steps; circulate 5–10 min between trims. |
Step-by-Step Mixing Procedure
Measure true operating reservoir volume: Measure the working water depth and container dimensions rather than relying on nominal tank labels. For a rectangular reservoir:
Volume (L) = (Length_mm x Width_mm x Fill_Depth_mm) / 1,000,000Volume (US gal) = Volume (L) / 3.7854Illustrative assumption: A20 gal (75.7 L)operating reservoir is used for the dosing example below. Verify actual concentrate dosing rates (mL/LormL/gal) on the nutrient datasheet.Establish circulation and temperature: Fill the reservoir to the
20 gal (75.7 L)mark with RO water at65–72°F (18–22°C). Turn on the submersible circulation pump or aeration stones before adding any chemical.Dilute potassium silicate first (if used): Add the datasheet dose of potassium silicate directly into the turbulent zone of the reservoir. Wait
10–15 minfor complete dispersion. Check pH with a calibrated meter; if pH exceeds7.5, lower it to6.0–6.8using pre-diluted acid before proceeding.Homogenize Ca-Mg supplement (if used): Add the Ca-Mg remineralizer to the reservoir and circulate for
5–10 min. Verify the incrementalEC25rise (typically0.15–0.30 mS/cmfor standard remineralization, depending on crop stage and datasheet target).Add Part A, then Part B separately: Pour the measured Part A concentrate into the reservoir flow stream, rinse the measuring vessel in the reservoir water, and circulate for
5–10 min. Measure and pour Part B into the reservoir flow stream, rinse the vessel, and circulate for10–15 min.Verify EC25 and trim concentration: Read
EC25 (mS/cm)with an ATC-enabled meter. If concentration is below target, add equal proportional micro-doses of Part A and Part B sequentially with5 mincirculation between them. If concentration is above target, top off with RO water using the dilution relation:Target_Volume = Current_Volume x (Current_EC25 / Target_EC25)Adjust final pH in pre-diluted micro-steps: Prepare a working pH-adjuster solution in a clean container by mixing
1 partstock acid or base with10 to 20 partsRO water (for example,10 mLadjuster into100–200 mLRO water). Add5–10 mLof the diluted mixture at a time to the20 gal (75.7 L)reservoir, circulate for5–10 min, and re-read pH until it settles within5.5–6.5.
Verification Checks
- Visual clarity: Inspect the reservoir bottom and water column under bright light after Step 6 and Step 7. The solution must remain clear (or uniformly tinted by iron chelates) with zero milky haze, white floc, or sediment on the tank floor.
- EC25 stability: Take two
EC25readings10 minapart after Part B addition. Readings should agree within0.02 mS/cm. - pH stabilization window: Check pH again
30–60 minafter the final micro-step adjustment. Because unbuffered RO water equilibrates slowly with dissolved CO2 and weak phosphate buffers from Part B, confirm pH remains within5.5–6.5before feeding plants. - Meter calibration alignment: Confirm the pH probe has been calibrated against fresh
pH 4.01andpH 7.00buffers and the EC probe matches a known conductivity standard (1.413 mS/cmor2.76 mS/cm) at25°Creference.
Real Failure Modes
- Silicate gelation and clouding: Adding potassium silicate into acidic water (
pH < 6.0) or pouring acid directly onto undiluted silicate causes silicic acid polymerization, forming an insoluble white gel or cloudy suspension that permanently strips silicon and fouls emitters. - Calcium-sulfate and calcium-phosphate precipitation: Adding Ca-Mg or Part A immediately before or alongside Part B without full circulation forms insoluble calcium sulfate (gypsum) and calcium phosphate salts. The solution turns milky,
EC25drops unexpectedly, and plants suffer simultaneous calcium, phosphorus, and sulfur lockout. - pH overshoot and buffer collapse: Dosing undiluted acid or base into zero-alkalinity RO water drives pH past
4.0or8.0in a single pour. Repeatedly bouncing pH up and down with acid and base adds excess counter-ions (K+,PO4-, orNO3-) and destabilizes iron chelates. - Misread ppm scales causing nutrient burn: Confusing a
500(NaCl) meter reading with a700(442) meter reading and increasing concentrate doses to match a higher ppm number over-concentrates the reservoir by40%in trueEC25salt strength. Always targetEC25 (mS/cm)directly.